Work order statuses
Also known as: WO, work order status.
A work order moves through a series of statuses as the job progresses. Statuses group into a few fixed stages — reporting, SLAs, and your board columns key off the stage, so the picture stays consistent even after an administrator renames a status or adds their own.
The default statuses
Section titled “The default statuses”| Default status | Stage | What it means |
|---|---|---|
| Open | Open | Raised and ready to be picked up. New work orders start here. |
| Assigned | Open | Given to a technician or vendor, but not yet started. |
| In progress | In progress | Someone is actively working on it. |
| Awaiting quote | On hold | Paused until a vendor quote comes back. |
| On hold | On hold | Paused for another reason — see the hold reason. |
| Pending approval | On hold | Waiting on a cost approval before work continues. |
| Resolved | Done | The work is finished; a resolution note is required. |
| Verified | Done | A manager has checked the completed work. |
| Closed | Done | Fully wrapped up. Reached only after Verified. |
| Cancelled | Cancelled | Called off. Used instead of deleting. |
An administrator can rename these statuses or add new ones to match how your team works, and can control which roles are allowed to make each move.
When a job is paused, it carries a hold reason so everyone knows what it is waiting on:
- Awaiting quote — a vendor price is needed.
- Awaiting approval — a cost sign-off is needed.
- Awaiting parts — a part has to arrive first.
- Awaiting access — the team can’t get to the location yet.
Priority
Section titled “Priority”Every work order has a priority: Low, Medium (the default), High, or Urgent. Priority is one of the inputs Belrald Assets uses to order the work technicians see, so reserve Urgent for safety or business-critical faults.
Closing out with codes
Section titled “Closing out with codes”When you resolve a work order, your workspace may ask you to record close-out codes against each asset:
- Failure code — what went wrong.
- Reason code — why it happened.
- Repair code — what you did to fix it.
These codes build the history that powers reliability reporting over time, so fill them in accurately. An administrator sets which codes are required before a work order can be resolved.
Procedures block resolution
Section titled “Procedures block resolution”If a work order has a procedure attached, the technician must complete it before the work order can be resolved. This is how you make sure a safety check or inspection actually happens rather than being skipped under time pressure.