Schedule preventive maintenance
Also known as: PM, PPM, planned preventive maintenance.
Preventive maintenance (PM) is planned, recurring work that keeps equipment running instead of waiting for it to break. A PM schedule is the rule that describes that recurring work — Belrald Assets then raises the work orders for you when they come due, so nothing slips through the cracks.
Follow these steps to create a time-based schedule. You can also trigger PM from a meter reading — see Trigger on a meter below.
Create a PM schedule
Section titled “Create a PM schedule”- In the sidebar, select Preventive maintenance.
- Select New schedule.
- In Title, name the routine so the generated work orders are easy to recognise — for example, “Quarterly HVAC filter change”.
- Under Assets, add the assets this routine covers. Choose the Location that anchors the schedule.
- For Trigger, choose Time. The trigger types are Time, Meter, and Condition — Condition exists but is coming soon and not yet available.
- Set the Frequency — either Floating (every N days), an interval that counts from the last completed job (for example, every 90 days), or Fixed (cron), where you enter a raw cron expression for a calendar schedule.
- Optionally attach a Procedure for the technician to complete, and set a default Assignee to receive the generated work orders.
- Decide how work orders are generated with the Bulk — generate one work order per asset checkbox (shown only for the Time trigger). Leave it off (the default) for a single work order covering all selected assets — good for a walk-round; tick it on for a separate job per asset — good when each needs its own sign-off.
- Select Create schedule.
Trigger on a meter instead
Section titled “Trigger on a meter instead”Some maintenance is driven by usage, not the calendar — an oil change every 5,000 km, for example. In step 5, choose Meter instead of Time, pick the Meter on the asset, and set the interval (the amount of usage between jobs). Belrald Assets raises the next work order when the meter passes that mark.
What happens next
Section titled “What happens next”The schedule starts running. When a job comes due, Belrald Assets raises a work order automatically, carrying over the procedure, assignee, and priority you set. You can pause, resume, or archive a schedule at any time, and use Run now to raise a work order immediately without waiting for the next due date. See the PM calendar reference to plan the year ahead.